FAST DRYING SCREED FROM EXPERTS BASED IN WORKSOP
Professional Screeding NATIONWIDE SERVICE
T: 07931 771952
E: [email protected]
FAST DRYING
With our fast drying screeds you can save months of waiting before getting on with the rest of your project. Unlike traditional screed which can take months to dry, our fast drying screed can simply take just a few hours. So if you are looking to complete to a tight deadline and want to avoid as many delays as possible then this form of screed would be an ideal choice for your project.
Using our Forced Action Mixer or M760D Putzmeister Screeding Pump to lay down the screed, this process will save your project a huge amount of time whilst maintaining the strength and longevity you are looking for.
The drying time for this screed is as follows:
Foot traffic – 12 hours
Tiling – 48 hours
Other floor coverings such as LVT, carpet and laminate – 5 days
RAPID STRENGTH
BW Screeding Ltd are very experienced installers of sand and cement screeds. Additives and aggregates can be adjusted to achieve the strength required to meet the needs of the project.
Get in touch with our Worksop-based team and remember we provide services nationwide.
Using our Forced Action Mixer or M760D Putzmeister Screeding Pump to lay down the screed, this process will save your project a huge amount of time whilst maintaining the strength and longevity you are looking for.
The drying time for this screed is as follows:
Foot traffic – 12 hours
Tiling – 48 hours
Other floor coverings such as LVT, carpet and laminate – 5 days
RAPID STRENGTH
BW Screeding Ltd are very experienced installers of sand and cement screeds. Additives and aggregates can be adjusted to achieve the strength required to meet the needs of the project.
Get in touch with our Worksop-based team and remember we provide services nationwide.